A Simple Example: A Small Parcel-Sorting Operation

A sorting station pays €4 per shift for equipment (fixed cost) and €1 per parcel for basic handling. It can process up to 4 parcels efficiently; beyond that, congestion and overtime add increasing variable costs.

FC = 4
VC(q) = q + 0.5[max(0, q − 4)]2
AFC = FC / q  ·  AVC = VC / q
ATC = AFC + AVC = (FC + VC) / q

Average Cost Table

Parcels (q)AFC (€)AVC (€)ATC (€)
14.001.005.00
22.001.003.00
31.331.002.33
41.001.002.00
50.801.101.90
60.671.332.00
70.571.642.21
80.502.002.50
90.442.392.83
100.402.803.20

Average Cost Curves

AFCAVCATC
0 1 2 3 4 5 Capacity: 4 1 2 3 4 5 6 7 8 9 10 Parcels per shift (q) Cost per parcel (€)